Pipeline Projects

Cherokee Pipeline Replacement - Project Profile

Issue link: https://resources.auduboncompanies.com/i/1169154

Contents of this Issue

Navigation

Page 0 of 0

People. Flexibility. Relationships. Experience. auduboncompanies.com info@auduboncompanies.com REV0-23-APR-2020 Scope of Work Audubon Companies provided survey and mapping services to replace a 10″ pipeline from Glenpool, OK to Mt. Vernon, MO — a total of 272 miles. Our team played an integral role in supporting the engineering team during the Front-end loading (FEL) phase to finalize as-built documentation. Audubon Companies was responsible for the preliminary survey, routing, construction staking, construction alignment sheet preparation, as-built survey, and as-built alignment sheet documentation, as well as providing geographical information system (GIS) data to load into the Pipeline Open Data (PODS) GIS database. Project Overview PROJECT PROFILE CHEROKEE PIPELINE REPLACEMENT ▪ 10" Pipeline ▪ 272 Miles Total ▪ Survey & Mapping ▪ Front-End Loading (FEL) Phase to finalize as-built documentation support ▪ GIS Client: A MAJOR LIQUIDS PIPELINE & REFINING COMPANY | Location: GLENPOOL, OK TO MT. VERNON, MO Professional Surveying and Engineering Services are only offered and performed in the states in which Audubon Field Solutions, LLC or Audubon Engineering Company, L.P. are licensed to offer or perform those services. Please contact us to obtain detailed licensing information and services offered by an Audubon Companies Entity.

Articles in this issue

Links on this page

view archives of Pipeline Projects - Cherokee Pipeline Replacement - Project Profile