Projects - Pipelines

Project Profile - Cherokee Pipeline Replacement

Issue link: https://resources.auduboncompanies.com/i/1169154

Contents of this Issue

Navigation

Page 0 of 0

People. Flexibility. Relationships. Experience. auduboncompanies.com info@auduboncompanies.com REV0-17-SEPT-2019 Scope of Work Audubon Field Solutions provided survey and mapping services to replace a 10″ pipeline from Glenpool, OK to Mt. Vernon, MO — a total of 272 miles. Our team played an integral role in supporting the engineering team during the Front-end loading (FEL) phase to finalize as-built documentation. Audubon Field Solutions was responsible for the preliminary survey, routing, construction staking, construction alignment sheet preparation, as-built survey, and as-built alignment sheet documentation, as well as providing geographical information system (GIS) data to load into the Pipeline Open Data (PODS) GIS database. Project Overview PROJECT PROFILE CHEROKEE PIPELINE REPLACEMENT › 10" pipeline › 272 miles total › Survey & mapping › Front-End Loading (FEL) phase to finalize as-built documentation support Client: A MAJOR LIQUIDS PIPELINE & REFINING COMPANY | Location: GLENPOOL, OK TO MT. VERNON, MO Professional Surveying and Engineering Services are only offered and performed in the states in which Audubon Field Solutions, LLC or Audubon Engineering Company, L.P. are licensed to offer or perform those services. Please contact us to obtain detailed licensing information and services offered by an Audubon Companies Entity.

Articles in this issue

Links on this page

view archives of Projects - Pipelines - Project Profile - Cherokee Pipeline Replacement