Pipeline Projects

Patriot Pipeline

Issue link: https://resources.auduboncompanies.com/i/1239408

Contents of this Issue

Navigation

Page 0 of 0

People. Flexibility. Relationships. Experience. auduboncompanies.com info@auduboncompanies.com REV0-22-APR-2020 Scope Of Work The Patriot Pipeline project consisted of a 48 mile, 16" pipeline and associated facilities with an aggressive in-service timeline of approximately 12 months from project kick-off. The origination point is near Coyanosa, TX, with delivery near Wink, TX at the Exxon Wink Terminal. As part of the design phase, Audubon Companies was responsible for survey & routing, ROW negotiation/acquisition, permitting and regulatory compliance, engineering, and environmental surveys. As a function of the construction and in-service process, we assisted in the construction management, provided environmental inspection, procurement support, and formulated an integrity management plan. From concept through construction, the EPCM project was successfully delivered within the required timeframe for XTO's required in-service. Project Overview PROJECT PROFILE PATRIOT PIPELINE ▪ Pipeline Engineering ▪ Project Management ▪ Environmental Permitting ▪ Survey & Mapping ▪ Right of Way ▪ Asset Integrity Management ▪ Pipeline Integrity ▪ Procurement ▪ Regulatory Compliance ▪ Corrosion Protection ▪ Pipeline Launcher & Receiver ▪ Mainline Valve Sites ▪ Metering Facility ▪ Pressure Let Down & Sample Skid ▪ 48 Mile 16 Inch Pipeline Client: XTO ENERGY | Location: WEST TEXAS

Articles in this issue

Links on this page

view archives of Pipeline Projects - Patriot Pipeline