Audubon Companies provided the engineering design and construc on management for a Landfill Gas (LFG)
to Renewable Natural Gas (RNG) biogas pipeline project. The conversion of LFG to RNG reduces CO2 emission
from landfills, while simultaneously providing a renewable energy source in the form of biogas. This project
enabled our client to distribute up to 4 million standard cubic feet per day (4 MMSCFD) of biogas to local
natural gas transmission providers. The project was completed in accordance with all local, state, and federal
jurisdic onal requirements.
Audubon Companies performed survey work including securing permits for construc on from each
jurisdic on, as well as environmental agencies and self-performed field surveys including civil topographic,
wetland, cultural, biological, and soil resis vity as required. The transmission pipeline was confirmed as
regulated by the Pipeline and Hazardous Materials Safety Administra on (PHMSA). Our team completed a
class loca on analysis to verify the pipeline is designed to the correct safety standard. The scope of work also
included construc on management and inspec on ac vi es and as-built documenta on.
Project Overview
▪
Renewable Natural Gas (RNG)
▪
Biogas Pipeline
PROJECT PROFILE
RENEWABLE NATURAL GAS (RNG)
PIPELINE
Scope of Work
▪
Project Management
▪
Conceptual & FEED
▪
Detail Engineering & Design
▪
Pipeline Engineering
▪
Right-of-Way
▪
Survey
▪
Environmental
▪
Construc on Management
Client: AMERESCO, MCCARTY ROAD FACILITY | Loca on: HOUSTON, TX