Projects - Offshore

Project: ENI Longhorn/Appaloosa Subsea Tiebacks

Issue link: https://resources.auduboncompanies.com/i/428912

Contents of this Issue

Navigation

Page 0 of 0

PROJECT PROFILE: Longhorn/Appaloosa Facilities CLIENT: ENI U.S. Operating LOCATION: Gulf of Mexico (GOM), MC-365A • Entirely new topsides facility development using the existing platform topsides • 4 major topsides modules including a 1,400-ton production module • Water depth is approximately 620 ft • Design capabilities: 15,000 BOPD, 250 MMSCFD, and 11,400 HP • Gas processing, treating, dehydration, compression and export systems • Oil processing, treating and export systems • Process control and safety system design integration • Electrical power generation • Inspection and construction management • Integration of subsea systems PROJECT OVERVIEW PROJECT SCOPE Our services included project management, procurement, engineering and design, automation, equipment inspection and construction management. Structural analysis was performed to verify the platform's sustainability for the intended field development. Additional work included the interface between topsides and subsea wells, including support for HPU and TUTA and automation links between the topsides and subsea controls programming. With Audubon Field Solutions, we provided the decommissioning of the existing production module and construction management for onshore and offshore activities. Cimation, an Audubon Companies affiliate, handled topsides automation. REV3-MAR-2016 auduboncompanies.com Visit our website to learn more about our featured projects New Orleans | Houston | Covington | Denver | Tulsa | Bogotá | La Porte | Pittsburgh | Durango

Articles in this issue

Links on this page

view archives of Projects - Offshore - Project: ENI Longhorn/Appaloosa Subsea Tiebacks