Projects - Offshore

Project: Pecos Platform

Issue link: https://resources.auduboncompanies.com/i/590226

Contents of this Issue

Navigation

Page 0 of 0

New Orleans | Houston | Baton Rouge | Pittsburgh | Tulsa auduboncompanies.com REV0-OCT-2015 PECOS PLATFORM • Single-level 48' caisson deck with a heliport • 6" pipeline approximately 6 miles long • Oversight of the caisson deck, helideck, separator, and pipeline installation • 15 MMSCFD • 400 barrels of condensate • Project management • Construction management • Coating inspections • I&E inspections • Procurement and cost-tracking PROJECT OVERVIEW PROJECT SCOPE CLIENT: Freeport-McMoRan LOCATION: Pecan Island Field, Vermilion Parish, Louisiana P R O J E C T M A N A G E M E N T & I N S P E C T I O N Visit our website to learn more about our featured projects Audubon Field Solutions performed project and construction management, coating inspections, and I&E inspections on the Pecos platform, a single-level 48' caisson deck with a heliport. The facility was engineered to flow 15 MMSCFD and manage 400 barrels of condensate. The scope of work also included procurement and cost tracking on all phases of the project. The team installed a 6″ pipeline, running from Pecos to Harvest SL-3763. Audubon Field Solutions added a new separator on the Harvest platform to manage production from the Pecos platform and oversaw the offshore installation of the separator, pipeline, caisson deck, and helideck.

Articles in this issue

Links on this page

view archives of Projects - Offshore - Project: Pecos Platform