Audubon Companies’ scope of work for Delta House FPS, an independent, semi-submersible floating production system, included multidisciplinary engineering design for the platform’s topsides.
Audubon Companies provided the Front-end Engineering Design (FEED) and detailed design of three 6-pile and one 4-pile, steel-jacketed facilities.
Audubon Companies performed project and construction management, coating inspections, and I&E inspections on the Pecos platform in the Pecan Island Field, Vermillion Parish, Louisiana.
Audubon Engineering Solutions provided topsides engineering support and modifications to W&T Offshore’s Matterhorn TLP production system and integrated the system.
Audubon Companies’ engineering teams performed Front-End Engineering Design (FEED), detailed design, procurement, project management, construction management, startup and commissioning for McMoRan.