People. Flexibility. Relationships. Experience. auduboncompanies.com
info@auduboncompanies.com
REV1-24-MAY-2022
The world's leading producer of Concord and Niagara-based grape products contracted Audubon to upgrade a
major steamer control system of two legacy boilers. The control system provides cri cal temperature control for
the juice and jelly produc on facility.
The project included design services and full demoli on of exis ng control panels, variable frequency drives
(VFD), and local control sta ons. The automa on team upgraded the dated hardware with new Allen-Bradley
ContolLogix and Yaskawa VFDs, which improved opera onal efficiency and system performance at the
manufacturing facility.
Project Overview
▪
Replaced exis ng programmable logic
controllers (PLC)
▪
Replaced PLC hardware
▪
Updated PLC panels and controls
▪
Replaced exis ng VFDs
▪
Developed human-machine interface screens
▪
Updated network and data communica ons
▪
Worked seamlessly with the supply chain
▪
Supported contractor demolishing and
installa on
PROJECT PROFILE
STEAM CONTROLS SYSTEM
UPGRADE
Scope of Work
▪
Project management
▪
Detailed design review
▪
Demoli on design package for contractors
▪
Control design and upgrade services
▪
Submi als documents and schema cs
▪
Startup & commissioning services
▪
PLC programming
Client: FOOD & BEVERAGE CLIENT | Loca on: PENNSYLVANIA